Robin and Joel's Kitchen Remodel (Joel Working)

prev next


The stairway wall's plaster was getting pretty loose. I decided to pull it down before it fell down. Now I will drywall the entire side when I do the new wall for the bathroom. (Sun 20 Apr 2003)

stairs1.jpg
stairs1.jpg
62.09 KB

Joel continues to do some work. He has one rafter bay insulated for the bathroom. He also attached the stairway light switch to a stud. (Sun 27 Apr 2003)

rafterins.jpg
rafterins.jpg
77.12 KB
stairswitch.jpg
stairswitch.jpg
65.57 KB

Here is a picture of the rafter bay being insulated. I used some old lathe to keep the foam insulation away from the roof. This creates an air channel so the roof has the same temperature air on both sides. (Sun 4 May 2003)

spaceins2.jpg
spaceins2.jpg
85.70 KB

Back to main page