Robin and Joel's Kitchen Remodel (Prep Floor)

prev next


The floor in the kitchen was covered with linoleum. That had to come up. There is nice maple flooring under the linoleum. The rear bedroom attaches to the kitchen. We might as well have that refinished. I pulled the 30 year old carpet out when I moved in. And the front bedroom needed it too. But there was some carpet in the hall between the bedrooms. That got pulled up too. So the project expanded. Now we had to move all of our belongings out of the bedrooms so the floor guy could sand and finish. We moved all of the stuff into the living and dining rooms so we wouldn't have to carry them down stairs. Some little items from the kitchen went to the basement. The oven went onto the front porch.

Bedroom furniture stacked up in dining room (Sun 23 Mar 2003)

furniture.jpg
furniture.jpg
76.67 KB
 

Rear entry and hall ready for sanding (Sat 22 Mar 2003)

rearentry1.jpg
rearentry1.jpg
79.80 KB
rearentry2.jpg
rearentry2.jpg
81.02 KB
hallway.jpg
hallway.jpg
78.59 KB

Bedroom floors ready to be sanded (Sat 22 Mar 2003)

readbed2.jpg
readbed2.jpg
77.10 KB
rearbed1.jpg
rearbed1.jpg
77.08 KB
frontbed1.jpg
frontbed1.jpg
73.64 KB
frontbed2.jpg
frontbed2.jpg
74.70 KB

Kitchen floor being pulled up. It took 2 hours to pull the tacks out. The last picture is of the pile of tacks I pulled. (Sat 22 Mar 2003)

oldfloor1.jpg
oldfloor1.jpg
43.39 KB
oldfloor2.jpg
oldfloor2.jpg
72.95 KB
oldfloor3.jpg
oldfloor3.jpg
76.83 KB
pullfloor1.jpg
pullfloor1.jpg
79.71 KB
pullfloor2.jpg
pullfloor2.jpg
79.21 KB
pullfloor3.jpg
pullfloor3.jpg
76.40 KB
pullfloor4.jpg
pullfloor4.jpg
75.25 KB
pullfloor5.jpg
pullfloor5.jpg
76.25 KB
pullfloor7.jpg
pullfloor7.jpg
75.56 KB
pullfloor6.jpg
pullfloor6.jpg
76.00 KB

Bare kitchen(Sat 22 Mar 2003)

kit10.jpg
kit10.jpg
46.68 KB
kit11.jpg
kit11.jpg
38.94 KB
kit12.jpg
kit12.jpg
81.63 KB
kit13.jpg
kit13.jpg
70.34 KB
kit14.jpg
kit14.jpg
74.21 KB
Pulled water
pipes out.
kitplumb.jpg
kitplumb.jpg
78.69 KB

Back to main page