Robin and Joel's Kitchen Remodel (Working on bathroom)

prev next


Update: Mon 4 Aug 2003

It might seem like we haven't been doing anything for a month. We have but nothing that was picture worthy. This past weekend I got the shower stall installed in the new bathroom. With a little bit of caulk we could use it. I put the other fixtures in to see what the bathroom will look like.

bathmock01.jpg
bathmock01.jpg
39.32 KB
bathmock02.jpg
bathmock02.jpg
40.88 KB
bathmock09.jpg
bathmock09.jpg
37.05 KB
bathmock10.jpg
bathmock10.jpg
44.30 KB
braceshower.jpg
braceshower.jpg
40.88 KB

When I put a shower in the first floor bathroom I put a historical marker behind the surround wall. I did the same thing with this shower.

loveshower.jpg
loveshower.jpg
42.22 KB

Update: Mon 10 Aug 2003

We made great progress on the bathroom this week. I chalked the shower and used it. I finished the last wall. Then I moved onto the floor. I put down some thin plywood as an underlayment for the vinyl flooring. I glued down the flooring and rolled it out. Then I installed the toilet. We spent our first night with a toilet on the same floor as our bedroom.

underlay.jpg
underlay.jpg
37.88 KB
rollfloor1.jpg
rollfloor1.jpg
48.45 KB
throne2.jpg
throne2.jpg
47.92 KB
toiletin.jpg
toiletin.jpg
35.44 KB

Update: Mon 20 Aug 2003

We painted the bathroom and stairway over the weekend. It is difficult to get a good picture of the bathroom because it is so small. But here they are.

paintbath.jpg
paintbath.jpg
42.10 KB
bath04.jpg
bath04.jpg
37.85 KB
bath05.jpg
bath05.jpg
40.68 KB
bath06.jpg
bath06.jpg
44.58 KB
rm.bath.jpg
rm.bath.jpg
39.75 KB
rm.stair.jpg
rm.stair.jpg
44.49 KB

Here is Robin using the kitchen.

rm.usekit.jpg
rm.usekit.jpg
62.19 KB

Eric and Hans stopped by. I tried to get Hans to paint, but he wanted to sleep.

hans.jpg
hans.jpg
57.78 KB

Back to main page